ROAD-CON Projects

 
 

Location: Longwood Gardens

Client: PennDOT

Longwood Gardens Bridge Renovations

2019 - Completed

Construction took place during the summer of 2019 on the arch bridge over Route 1 for Longwood Gardens. Work consisted of spall repairs to the concrete arch barrel and deck above, ringstone adjustments on both façades, repointing masonry on façades and parapets, replacement of masonry slopewalls to concrete slab slopewalls, and roadway repairs on both approaches of bridge. Coordinated planning with Longwood Garden’s events and local businesses minimized traffic impacts during the busy season. The bridge is one of the few privately owned bridges within PennDOT right of way and acts as a main access to and from the gardens off of State Route 1.

 
 
Stay updated on what we're up to